ASEE Group ensured peace & quiet at Hyde Park Corner! We installed powerful backup generators (2 x 1650 kVA) in the basement with muffled piping & soundproof walls.
ASEE Group powered up HP's Doxford data centre! We delivered & installed 2 secure fuel tanks & containerized generators. A complete external fuel system ensures smooth operation.
ASEE Group bolstered Dumfries hospital's power! We delivered & installed 4 containerised generators & ensured seamless operation with a full internal fit-out.
ASEE Group empowered Canary Wharf's data centre! We installed 3 robust, roof-mounted generators with secure fuel lines and control cables for reliable backup power.
ASEE Group supercharged Berkshire Data Centre! We installed 6 powerful generators with massive, secure fuel tanks (2 x 80,000L & 6 x 4,000L) & a robust, leak-protected fuel transfer system.