OUR PROJECTS
Berkshire Data Centre
Project Scope
We designed and installed a comprehensive backup power solution featuring 6 high-capacity generators (each 3.0 MVA). To guarantee reliable operation, we provided massive, secure fuel storage with 2 double-skinned 80,000L above-ground tanks and 6 dependable 4,000L day tanks – all manufactured according to BS799 Part 5 for maximum safety and environmental protection. A fully welded fuel transfer system with leak detection safeguards the environment, while integrated fuel polishing facilities maintain optimal fuel quality. We even installed a robust water cooling system for each generator, ensuring efficient heat dissipation. Finally, all associated control cables, noise attenuation, and exhaust systems were meticulously installed. !
Project Overview
Installation of 6 x 3.0 MVA generators complete with all associated fuel tanks and transfer pipe work.
2 x 80,000L double skinned above ground bulk storage tanks, manufactured to BS799 Part 5, with fuel polishing facilities and leak detection provided.
6 x 4000L double skinned generator day tanks, manufactured to BS799 Part 5, with leak detection provided.
2 x Bunded pump kiosks with duty/standby pumps, fuel control panel and leak detection.
We installed a double skinned fully welded fuel transfer system with leak detection monitoring.
2 x Roller shutter door fill points complete with fuel meters, high level alarm units and fuel capacity gauges.
We installed a fully welded water cooling system for 6no generators extending to flow/return/fill/vent lines for the engine jacket and flow/return/fill/vent lines for the after cooler from each generator to the remote radiators.
All welds were subject to 10% NDT.
We also installed all associated generator control cables, attenuation and exhausts/flues.
Location
United Kingdom
Sector
Data Centre