Generator Installations

What We Offer

  • Bulk fuel storage tanks and fuel systems (onsite or offsite build)
  • Exhaust, Gas & Silencer Systems
  • Attenuation Systems
  • Air start systems
  • Radiator / coolant systems
  • HVAC Control Systems
  • Fuel Control Systems
  • UPS Installation
  • Transformer Installations
  • Neutral Earthing and Resistive Earthing Systems
  • Generator Control Systems
  • Generator Load Testing
  • Generator Synchronising
  • Generator / Mains Synchronisation – G59 etc.
  • Exhaust Gas emissions treatment storage and distribution systems
  • Integration to BMS systems
  • Point indicative leak detection systems
  • Mixed waste liquid spill diversion, storage and control
  • Exhaust gas Venturi type terminals
  • Structural steel design, build, erect

Generator Projects

At ASEE we offer a full bespoke generator installation package. Designed to specifically meet the clients requirements, we have built up a strong team of experts who can deliver the very best in quality generators every time. Some of our range includes; Bulk fuel storage tanks, generator control systems, generator load testing & synchronising. Please see below for the full range of generator packages we offer.

See All Generator Projects

Royal Liverpool University Hospital

Offload and position of four containerised generator sets Full internal Mechanical & Electrical fit out

Northern Data Centre

Installation of 10 x 2.3 MVA HV generators and associated HV switchgear and 380,000 L bulk fuel storage tanks manufactured to EN 12285. (All storage tanks underground).

Introducing the new…

Venturi

ASEE have developed an Exhaust gas Venturi type terminal suitable for diesel generators, tested up to 580DegC and 9.3m3/sec.

Our design brief was to develop an irreducible piece suitable for the selected diesel generator allowable back pressure with reduced soot marking.

The ASEE Ltd Exhaust gas Venturi type terminal is made from stainless steel and requires no coating or paint.

No moving parts yet protection from rain, snow, sand and other particles.

A CFD analysis is available for the desired size and input parameters.

ASEE Ltd have manufactured and installed terminals ranging from DN250 to DN600. Over 200 units on ASEE projects as generator integration contractor with units currently in production. ASEE Ltd currently also export the terminals to North and South America. Providing Ex Works, sea or air freight solutions. Over 250 units have been delivered with units currently in production.

CFD and general arrangement drawings within 1 week. Lead time from production approval starts at 4 weeks ex works.

Find Out More

Our Client Base includes

NHS
Microsoft
BBC
ISG
Laing O'Rourke
TfL
Primark
IBM