Our Scope of work here will be to install 1no. 3.8 MVA HV generator complete with all electrical and mechanical services.

The generator will will be positioned in the level 3 basement. We will site build 1 no. 130.000 litre bulk fuel tank and install a complete fuel system including daily storage tank, duplex pump system and fuel cooler.

Also we will install all the MV, LV and fibre optic systems, and an exhaust flue system that will be installed from the basement to the roof on the 8th floor in a dedicated riser.

Some pictures below of our offload.

We have now started our attenuation and containment fit outs here and our tank build is nearing completion.

We have the generators built back up and we are expecting our flue delivery very soon.

Our tank build is complete and our cooling pipework is nearing completion, we also have started our double skinned fuel pipework.

Some recent pictures below.